General Notes
All construction plans approved by the City of Marysville must include general notes that govern the construction methodologies used by the construction contractor for a particular project:
  • General - This information must be included on all approved construction plans.
  • Storm - This information must be included on all construction plans that include public storm system improvements.
  • Streets - This information must be included on all construction plans that include roadway improvements within the city right-of-way.
  • Wastewater - This information must be included on all construction plans that include public sanitary sewer system improvements.
  • Water - This information must be included on all construction plans that include public water system improvements.

Specifications

Infrastructure that will be maintained by the City of Marysville must be constructed in compliance with the technical specifications approved by the city engineer:
  • Marysville Supplemental Specifications - These specifications must be followed during the engineering design and contractor installation of any project that includes roadway improvements within the city right-of-way.
  • Ohio Department of Transportation (ODOT) - These specifications must be followed during the engineering design and contractor installation of any project that includes roadway improvements within the city right-of-way.
  • Stormwater Drainage Manual - This document outlines the regulations pertaining to stormwater conveyance (storm sewer design, flood routing, etc.) and drainage pond (i.e. retention/detention basins) design. These specifications must be followed during the engineering design and contractor installation of any project that includes public stormwater facilities.
  • Wastewater - These specifications must be followed during the engineering design and contractor installation of any project that includes public sanitary sewer system improvements.
  • Water - These specifications must be followed during the engineering design and contractor installation of any project that includes public water system improvements.

Standard Drawings
Infrastructure that will be maintained by the City of Marysville must be constructed in compliance with the technical specifications approved by the city engineer. All applicable standard drawings must be referenced within all approved construction plans:
  • Storm - All applicable drawings must be referenced within all construction plans that include public storm system improvements.
  • Streets - All applicable drawings must be referenced within all construction plans that include roadway improvements within the city right-of-way.
  • Wastewater - All applicable drawings must be referenced within all construction plans that include public sanitary sewer system improvements.
  • Water - All applicable drawings must be referenced within all construction plans that include public water system improvements.

General Plans and Policies
The following items are enforced/required by the Engineering Department during the approval process: